The time it takes water to move from the point of disinfectant application (or the previous point of residual disinfectant measurement) to a point before or at the point where the residual disinfectant is measured. In pipelines, the time is calculated by dividing the internal volume of the pipe by he maximum hourly flow rate; within mixing basins and storage reservoirs it is determined by tracer studies of an equivalent demonstration.
Be the first to post feedback! Click here to post feedback.
Post Feedback:
Login using the form on the top of the page to post feedback (if you are a registered user). If you have not yet registered, click here to do so. It's FREE!.